Comparison
Toewongwai's pile-driving
crane has been designed to be highly mobile, easy to install and to
work well in various soil types. It helps save time and operating cost
which means more profits for pile-driving contractors. See the summarized
table comparing between our highly mobile cranes and the traditional truss
cranes and you would realize that it's time to switch to Toewongwai's
mobile crane!
|
Financial
Comparison
|
Traditional
truss crane 
|
Toewongwai's
Highly Mobile Crane 
|
| Assume
1 job was taken |
Revenue
Baht 15,000
|
Revenue
Baht 15,000
|
| Time
till the completion of the job |
6
days
|
1
day
|
| Wages
paid to the employee(s) |
(
50% ) 7,500
|
( 20% ) 3,000
|
| (Less)
costs of parts and depreciation |
As
equipment moving expenses
|
(
30% ) 4,500
|
| IF
worked for 6 days |
1
job was completed
|
6
jobs were completed
|
| Total
wages employee(s) received (6 days of work) |
Baht
7,500
|
Baht
18,000
|
| Compensation
for the contractor (6 days of work) |
Baht
7,500
|
Baht
45,000
|
| |
|
|
|
Working
Performance Comparison
|
Traditional
truss crane 
|
Toewongwai's
Highly Mobile Crane 
|
| Moving
of the driving equipment items |
Need
to load on a 6 or 10-wheeled truck
|
No
loading needed, items are already equiped on the truck
|
| Time
spent on assembly & setup |
Approx.
1-2 DAYS
|
Approx.
20 MINUTES
|
| Time
spent on lifting the pile |
Approx.
5 - 10 minutes
|
Approx.
5 - 10 minutes
|
| Time
spent on setting up the pile in a vertical position. |
Approx.
20 minutes
|
Approx.
5 minutes
|
| Driving
time / pile |
Approx.
10-30 minutes
|
Approx.
10-30 minutes
|
| Blow
Counts / pile |
Approx.
10-30 minutes
|
Approx.
10-30 minutes
|
| Time
spent on moving from one pile to another |
Avg.
1 hour / pile
|
Avg.
5 minute / pile
|
| Time
spent on equipment dismantling/ packing |
Approx.
1 day
|
Approx.
20 minutes
|
| Time
spent on moving equipment out of site |
Approx.
4-8 hours for loading on the truck
|
Immediately
|
Total
time spent on one building - about 20 piles (from installing, to driving,
to moving out)
|
Approx.
5-6 days
|
Approx.
4-6 hours
|
|